SLD Pumps & Power have secured 2 x 12 week shutdowns at BNFL Hunterston Power Station.

The temporary power package contains 2 x 350kva generators, 2 x 3,000ltr Bunded Fuel Tanks, 2 x 400 amp Distribution Panels and associated cables.
The temporary power package contains 2 x 350kva generators, 2 x 3,000ltr Bunded Fuel Tanks, 2 x 400 amp Distribution Panels and associated cables.
Shutdown 1 – The generators are powering a dehumidification system that supplies clean dry air, to a dew point of -40, for the maintenance work required on reactor “A”.
Shutdown 2 – The generators are powering a dehumidification system that supplies clean dry air, to a dew point of -60, for the maintenance work required on reactor “B”.